How long does it really take to ship a website with Lovable?

    With Lovable Web Agency, a marketing site ships in 48 business hours, a full marketing site in 72 hours and an app with auth and a database in 96 hours, a contractual timeline governed by our terms. DIY on Lovable, plan 1 to 10 days depending on your fluency and actual complexity.

    Published Updated
    Timeline per project type — contractual, suspension cause and actual
    Project typeContractual timelineFrequent suspension cause (ToS art. 7.2)Observed actual timeline
    Marketing site48 business hoursMissing text/visual content45-50h
    Full site72 business hoursLate client sign-off on mockup68-76h
    App with auth + DB96 business hoursStripe/domain access not provided90-98h
    Multi-role SaaS96h + amendmentScope extended mid-project100-140h
    Based on our projects delivered in 2025-2026 (scope: 24 projects billed as Starter/Pro/Scale). See ToS art. 5.2 and 7.2.

    What are the phases of a Lovable project?

    Four phases structure a project: (1) product framing (goals, journeys, content, sitemap), (2) build (AI-assisted generation + third-party integrations), (3) iteration (client reviews, UX/UI tweaks), (4) go-live (deployment, redirects, monitoring, DNS).

    Most of the time goes to framing and iteration, not to the build itself. Thanks to Lovable, code generation is only a fraction of the schedule: most of the contractual timeline is spent framing correctly and validating with the client, not hand-writing code.

    What are our contractual timelines per package?

    Our three packages set a contractual timeline in business hours, counted from receipt of all required elements (content, access, approvals): Starter 48h for a marketing site of up to 5 pages, Pro 72h for a full site of up to 12 pages, Scale 96h for an unlimited-page project with one month of support included.

    These timelines are publicly verifiable on our homepage and restated in our terms of service. Any request outside the initial scope requires a written amendment (ToS art. 5.2), which may change the announced timeline.

    Timeline per project type: contractual vs actual
    Project typePackageContractual timelineObserved actual timeline
    Marketing site (≤5 pages, no backend)Starter48 business hours45-50h
    Full site (≤12 pages, blog, forms)Pro72 business hours68-76h
    App with auth + databaseScale (partial)96 business hours90-98h
    Multi-role SaaS (auth, roles, billing)Scale + amendment96 business hours + amendment100-140h
    Based on our projects delivered in 2025-2026 (scope: 24 projects billed as Starter/Pro/Scale). Multi-role SaaS structurally exceeds the Scale package and triggers a written amendment (ToS art. 5.2).

    What suspends the contractual timeline countdown?

    ToS art. 7.2 states that the business-hours countdown is suspended as long as the client has not provided the elements required to move forward: validated text and visual content, access to third-party accounts (domain name, Stripe, existing tools), sign-off on a blocking step.

    The countdown resumes once the missing elements are fully received. This clause protects the contractual timeline: it prevents a client-side delay from being attributed to the agency, and explains why two projects under the same package can show very different delivery dates despite an identical number of billed business hours.

    • Content (copy, images, logos) not delivered on time
    • Missing third-party access (domain name, Stripe, CRM)
    • No client feedback on a blocking validation step
    • Scope-change request pending a signed amendment

    Which factors lengthen or shorten the timeline?

    Lengthen: unclear scope at kickoff, unprepared content, complex third-party integrations (multi-currency, internal ERP), multilingual beyond two languages, sector-specific regulatory compliance.

    Shorten: a precise briefing from the first call, an existing design system or brand guidelines, content written and approved upfront, standard already-documented integrations (Stripe, HubSpot, Cal.com).

    What are real delivery examples?

    AXE Capital: full marketing rebuild delivered in 72 business hours, from kickoff to production, Pro package.

    Osmose Solutions: premium institutional site delivered in 48 business hours for a trade event, Starter package.

    Docart: full SaaS app (auth, upload, AI, payments) delivered in 96 business hours for beta launch, Scale package.

    Why the gap between a DIY delivery and an agency one?

    DIY on Lovable, the generator produces code in minutes, but real time dilutes into unstructured iteration: prompt trial-and-error, no formalised product framing, late discovery of technical constraints (RLS, edge functions, SEO).

    A specialised agency compresses this time by applying a methodology repeated across dozens of similar projects: framing templates, a go-live checklist, and detailed knowledge of the platform's limits.

    Key data

    48 business hours / ≤5 pages
    Marketing site (Starter)
    Public source
    Lovable Web Agency — offre
    72 business hours / ≤12 pages
    Full site (Pro)
    Observed on our projects
    96 business hours / unlimited
    App with backend (Scale)
    Observed on our projects
    100-140h
    Average actual timeline for multi-role SaaS
    Observed on our projects
    ≈5%
    Average contractual/actual gap
    Observed on our projects

    Related questions

    Does the timeline include iterations?
    Yes, each package includes a defined number of client reviews within the announced contractual timeline.
    What happens if my content is not ready?
    The countdown is suspended per ToS art. 7.2 until content is received. We can also help with copywriting if needed, via an amendment.
    Does a multi-role SaaS fit into the Scale package?
    The Scale package covers the base (auth, database, unlimited pages). Multiple roles and advanced billing often exceed this base and require a written amendment.
    Is express delivery possible?
    Yes, subject to team availability and a clear scope from the first exchange — contact us.
    What does the Scale package's support cover?
    90 days of technical support and 3 months of maintenance included: minor fixes, adjustments, security updates and go-live support.
    Why does the actual timeline sometimes exceed the contractual one?
    The contractual timeline counts active business hours; suspension periods (ToS art. 7.2) extend the calendar delivery date without changing the number of billed hours.

    Keep exploring the site

    Sources & external links

    About the author

    Simon Berna
    Founder of Lovable Web Agency

    Simon Berna is president of Axe Capital and founder of Lovable Web Agency. He helps entrepreneurs and SMEs design, ship and scale websites and apps built with Lovable AI.

    LinkedIn profile

    How we verify: pricing and features of the platforms mentioned come from their official pages, consulted on the update date above and linked at the end of this article. Durations, iteration counts and project costs labelled "observed on our projects" come from engagements delivered by Lovable Web Agency, with their scope stated. We publish no unsourced projection or market average, and we correct a figure as soon as a vendor changes its pricing.

    Publisher: Axe Capital, a French SAS registered in Lyon, SIREN 904 636 222, operating the Lovable Web Agency brand.

    Updated

    Want to go further on your project?

    Ready to launch your
    web project?

    Let's discuss your project and choose the package that suits you

    Response within 24 hours
    No commitment
    Personalized quote
    fr